this post was submitted on 28 Dec 2025
61 points (96.9% liked)

No Stupid Questions

44957 readers
738 users here now

No such thing. Ask away!

!nostupidquestions is a community dedicated to being helpful and answering each others' questions on various topics.

The rules for posting and commenting, besides the rules defined here for lemmy.world, are as follows:

Rules (interactive)


Rule 1- All posts must be legitimate questions. All post titles must include a question.

All posts must be legitimate questions, and all post titles must include a question. Questions that are joke or trolling questions, memes, song lyrics as title, etc. are not allowed here. See Rule 6 for all exceptions.



Rule 2- Your question subject cannot be illegal or NSFW material.

Your question subject cannot be illegal or NSFW material. You will be warned first, banned second.



Rule 3- Do not seek mental, medical and professional help here.

Do not seek mental, medical and professional help here. Breaking this rule will not get you or your post removed, but it will put you at risk, and possibly in danger.



Rule 4- No self promotion or upvote-farming of any kind.

That's it.



Rule 5- No baiting or sealioning or promoting an agenda.

Questions which, instead of being of an innocuous nature, are specifically intended (based on reports and in the opinion of our crack moderation team) to bait users into ideological wars on charged political topics will be removed and the authors warned - or banned - depending on severity.



Rule 6- Regarding META posts and joke questions.

Provided it is about the community itself, you may post non-question posts using the [META] tag on your post title.

On fridays, you are allowed to post meme and troll questions, on the condition that it's in text format only, and conforms with our other rules. These posts MUST include the [NSQ Friday] tag in their title.

If you post a serious question on friday and are looking only for legitimate answers, then please include the [Serious] tag on your post. Irrelevant replies will then be removed by moderators.



Rule 7- You can't intentionally annoy, mock, or harass other members.

If you intentionally annoy, mock, harass, or discriminate against any individual member, you will be removed.

Likewise, if you are a member, sympathiser or a resemblant of a movement that is known to largely hate, mock, discriminate against, and/or want to take lives of a group of people, and you were provably vocal about your hate, then you will be banned on sight.



Rule 8- All comments should try to stay relevant to their parent content.



Rule 9- Reposts from other platforms are not allowed.

Let everyone have their own content.



Rule 10- Majority of bots aren't allowed to participate here. This includes using AI responses and summaries.



Credits

Our breathtaking icon was bestowed upon us by @Cevilia!

The greatest banner of all time: by @TheOneWithTheHair!

founded 2 years ago
MODERATORS
 

I keep hearing how everyone’s electric bills are going up with AI data centers near them. Why aren’t the companies paying the bill? Or is it building the infrastructure to accommodate them the issue?

you are viewing a single comment's thread
view the rest of the comments
[–] dhork@lemmy.world 12 points 11 hours ago* (last edited 11 hours ago) (1 children)

Or is it building the infrastructure to accommodate them the issue?

It's this, but that's only part of the story.

Datacenter companies are very efficient at building new ones now, once they have all the proper permits and can start building it can go from an empty lot to fully functional in a year or two. Maybe longer for the huge hyperscalar ones.

Once they are online, their power demand is comparable to a small city, coming online all at once. But the local utility never had this demand in its plan, so they have to build more capacity to service it, and building a new power plant takes much longer. In the meantime, the demand will outstrip their capacity and the utility will have to buy more power on the open market. This drives up costs for all their customers unless the utility is allowed to charge these customers (whose existence has blown up all their capacity planning) more.

As a side note, they often get advantages and tax breaks because they promise to bring jobs to the area. And the initial construction jobs usually are significant. But once the place is built, it's ongoing operations only requires a few dozen positions, many of them low-tech and outsourced like site security. The higher-tech jobs (like the network engineering) is often not on-site anyway. A shopping plaza would generate more jobs than a datacenter.

[–] randompasta@lemmy.today 6 points 11 hours ago

It's worse than that. While the power company starts making plans for the additional load that's already there, datacenter developers bring in gas turbine generators. This adds to the noise and pollution. The local municipality may fine them a few hundred dollars a month for violations, but that's the cost of doing business.